Sunday, July 4, 2010

DRAX 2 : phase 2 begins





i have all the main work related components in the face now and all are wired.. minus connex to the board they have to go to. so the next step was to get a hinged back frame to hang all the modules and sub modules on. and start on their arrangement (important). the arrangement depends on what needs to be connected to what and WHERE. the biggest concern was that the 2 boards for the 2 rows of cvs are near and shortest.. since they were allready wired. i had planned on doing things don the center originally but now i see that was mistake .. so all wires should be run down to the right side (from back) and then over to the boards... i can either rewire all the pots whick wouldnt be THAT bad or leave then as is.. i may opt to re wire since ive tried to be logical and plan ahead so far... so the pics are of the back pre frame and post frame.. also theyll be a little video giving a panarama and a demo of the hinge.. simple but effective. now its finish the propagation of the boards and maybe rty to find breakaway headers for the connections. that would be incredibly helpful in the long run.

No comments:

Post a Comment